# FRMCS: New ETSI testing work and UK research projects

Canonical: https://frmcs.org/news/frmcs-etsi-testing-uk-research
Language: en (German version: https://frmcs.org/de/news/frmcs-etsi-tests-forschung-grossbritannien)
Markdown: https://frmcs.org/md/news/en/frmcs-etsi-testing-uk-research
Author: FRMCS Atlas Editorial
Published: 2026-10-23
Editorial cut-off: 2026-10-22
Version: 1

## Summary

ETSI has adopted three work items for FRMCS conformance testing. The UK is funding research into spectrum requirements and lifecycle management. Further updates cover equipment capabilities and a Finnish market consultation.

## ETSI expands work on FRMCS conformance testing

On 19 October 2026, ETSI adopted three work items covering client conformance testing under TS 104 069-1, server conformance testing under TS 104 069-2, and test applicability and Implementation Conformance Statements under TS 104 070. These statements document which specified capabilities an implementation supports.

The client and server testing work includes developing Release 19 test cases and maintaining existing Release 18 tests. Conformance testing provides a systematic way to assess whether an implementation meets the relevant technical requirements.

Adoption of the work items is a step in the standardisation process. It does not constitute publication of new, completed versions of the standards.

Sources: [ETSI – Client conformance testing](https://portal.etsi.org/webapp/WorkProgram/Report_WorkItem.asp?WKI_ID=79555) · [ETSI – Server conformance testing](https://portal.etsi.org/webapp/WorkProgram/Report_WorkItem.asp?WKI_ID=79556) · [ETSI – Test applicability and Implementation Conformance Statements](https://portal.etsi.org/webapp/WorkProgram/Report_WorkItem.asp?WKI_ID=79557)

## UK research addresses spectrum requirements and lifecycle management

On 14 October 2026, RSSB and Network Rail announced funding for two FRMCS research projects. MapFrag aims to quantify spectrum requirements in Great Britain and investigate data management and quality of service.

A second project addresses obsolescence management: how FRMCS systems can remain maintainable and upgradeable over time, and what lifecycle costs this entails.

The projects are scheduled to start in November 2026. No research results are available as of the editorial cut-off.

Source: [RSSB – Funding for new UKRRIN projects](https://www.rssb.co.uk/about-rssb/insights-and-news/news/targeting-real-world-impact-rssb-and-network-rail-fund-15-new-ukrrin-projects)

## New early draft on equipment capabilities

Draft 0.0.2 of ETSI TS 103 765-5, which addresses FRMCS user equipment capabilities, was made available on 13 October 2026.

ETSI’s metadata confirms the version change. Access to the document attachment is restricted, so specific technical changes could not be verified. This is an early draft, not a final published standard.

Source: [ETSI – TS 103 765-5](https://portal.etsi.org/webapp/WorkProgram/Report_WorkItem.asp?WKI_ID=77307)

## Finnish market consultation: response deadline on 23 October

The Finnish FRMCS market consultation lists a response deadline of 23 October 2026 at 16:00 Finnish time, equivalent to 15:00 Swiss time.

The procedure supports information gathering and market dialogue. It is a request for information (RFI), not the award of a supply contract.

Source: [Finnish procurement portal – FRMCS market consultation](https://tarjouspalvelu.fi/UX/TP/SiirryTarjouspyyntoon/?tpId=630224)

## Sources

1. [ETSI – Client conformance testing](https://portal.etsi.org/webapp/WorkProgram/Report_WorkItem.asp?WKI_ID=79555) — ETSI, TS 104 069-1 (RTS/RT-00106), published 2026-10-19, retrieved 2026-10-23 · Original retrieved
2. [ETSI – Server conformance testing](https://portal.etsi.org/webapp/WorkProgram/Report_WorkItem.asp?WKI_ID=79556) — ETSI, TS 104 069-2 (RTS/RT-00107), published 2026-10-19, retrieved 2026-10-23 · Original retrieved
3. [ETSI – Test applicability and Implementation Conformance Statements](https://portal.etsi.org/webapp/WorkProgram/Report_WorkItem.asp?WKI_ID=79557) — ETSI, TS 104 070 (RTS/RT-00108), published 2026-10-19, retrieved 2026-10-23 · Original retrieved
4. [RSSB – Funding for new UKRRIN projects](https://www.rssb.co.uk/about-rssb/insights-and-news/news/targeting-real-world-impact-rssb-and-network-rail-fund-15-new-ukrrin-projects) — RSSB, published 2026-10-14, retrieved 2026-10-23 · Original retrieved
5. [ETSI – TS 103 765-5](https://portal.etsi.org/webapp/WorkProgram/Report_WorkItem.asp?WKI_ID=77307) — ETSI, Early draft 0.0.2, published 2026-10-13, retrieved 2026-10-23 · Original retrieved
6. [Finnish procurement portal – FRMCS market consultation](https://tarjouspalvelu.fi/UX/TP/SiirryTarjouspyyntoon/?tpId=630224) — Suomen Erillisverkot Oy (Tarjouspalvelu.fi), 630224 / RFI of FRMCS for Virve2, published 2026-10-04, retrieved 2026-10-23 · Original retrieved


## Cite as

FRMCS: New ETSI testing work and UK research projects. FRMCS Atlas. https://frmcs.org/news/frmcs-etsi-testing-uk-research (last material update 2026-10-23)

> FRMCS Atlas is an independent editorial reference, not an official UIC, ETSI or ERA publication or endorsement. Claims are source-linked; review status is recorded per version from stored records only; publication alone is not evidence of a technical review.
