# FRMCS suppliers and their roles

Canonical: https://frmcs.org/suppliers (English) · https://frmcs.org/de/lieferanten (Deutsch)
Research status: 2026-09-30

Orientation across the industry actors documented in the underlying research. Roles describe the evidenced excerpt, not the complete company portfolio. No ranking; project participation, announcements and interoperability tests carry different evidential weight.

## Functional areas
- Network infrastructure & transport: Radio access, 5G core network and data transport
- Communication services & MCX: Mission-critical voice, data and video services
- Control centres & applications: Operation and integration of operational communication
- Onboard equipment & gateways: Connecting cabs, vehicle applications and trackside systems
- Components & integration: Antennas, radio modules, network hardware and complementary building blocks
- Test & monitoring: Testing interoperability, conformance of individual functions and performance

## Suppliers
### Nokia
- Areas: Network infrastructure & transport
- Documented contribution: Network architecture with radio access, transport network, core, orchestration and security functions
- Evidence assessment: Vendor profile and MORANE-2 integration lab
- Sources: [Nokia unveils commercial 5G solution for next-gen digital railway operations supporting FRMCS](https://www.nokia.com/newsroom/nokia-unveils-commercial-5g-solution-for-next-gen-digital-railway-operations-supporting-frmcs/) — Nokia, published 2025-08-27, retrieved 2026-10-03 · Original retrieved (Manufacturer's own statement; not independent verification of delivery capability, approval or deployment.); [FP2-MORANE-2 – Project structure](https://rail-research.europa.eu/pages/fp2-morane-2/structure) — Europe's Rail, Project structure, retrieved 2026-10-03 · Original retrieved (runs one of three integration labs); [Nokia deploys world's first 1900 MHz 5G radio network on Deutsche Bahn test track supporting FRMCS](https://www.fp2morane2.eu/news/nokia-deploys-worlds-first-1900-mhz-5g-radio-network-on-deutsche-bahn-test-track-supporting-frmcs/) — FP2 MORANE-2, published 2025-09-15, retrieved 2026-10-03 · Original retrieved (Project website news item.); [FP2-MORANE-2 – CORDIS project fact sheet (grant 101196125)](https://cordis.europa.eu/project/id/101196125) — European Commission, CORDIS, Project dates 1 Dec 2024 – 30 Sep 2027; participant list with role types, retrieved 2026-10-03 · Original retrieved (CORDIS role: participant. The project summary still refers to a TSI 2027 objective. That is the historic plan at proposal time; later UIC statements target CCS TSI 2028.); [5GRAIL – CORDIS project fact sheet (grant 951725, 1 Nov 2020 – 31 Dec 2023)](https://cordis.europa.eu/project/id/951725) — European Commission, CORDIS, Participant list with role types, retrieved 2026-10-03 · Original retrieved (CORDIS role: participant)

### Ericsson
- Areas: Network infrastructure & transport
- Documented contribution: Dedicated 5G railway networks, radio access and core
- Evidence assessment: Vendor publication; runs a MORANE-2 integration lab
- Sources: [Smart railways with mission-critical 4G and 5G](https://www.ericsson.com/en/industries/rail) — Ericsson, retrieved 2026-10-03 · Original retrieved (Manufacturer's own statement; not independent verification of delivery capability, approval or deployment.); [FP2-MORANE-2 – Project structure](https://rail-research.europa.eu/pages/fp2-morane-2/structure) — Europe's Rail, Project structure, retrieved 2026-10-03 · Original retrieved (runs one of three integration labs); [FP2-MORANE-2 – CORDIS project fact sheet (grant 101196125)](https://cordis.europa.eu/project/id/101196125) — European Commission, CORDIS, Project dates 1 Dec 2024 – 30 Sep 2027; participant list with role types, retrieved 2026-10-03 · Original retrieved (CORDIS role: participant. The project summary still refers to a TSI 2027 objective. That is the historic plan at proposal time; later UIC statements target CCS TSI 2028.)

### Kontron Transportation
- Areas: Communication services & MCX, Network infrastructure & transport
- Documented contribution: FRMCS and MCX communication, network technology and interworking with GSM-R
- Evidence assessment: Vendor profile and MORANE-2 integration lab
- Sources: [FRMCS | Kontron](https://www.kontron.com/en/products-solutions/transportation-solutions/frmcs) — Kontron, retrieved 2026-10-03 · Original retrieved (Manufacturer's own statement; not independent verification of delivery capability, approval or deployment.); [FP2-MORANE-2 – Project structure](https://rail-research.europa.eu/pages/fp2-morane-2/structure) — Europe's Rail, Project structure, retrieved 2026-10-03 · Original retrieved (runs one of three integration labs); [5th ETSI FRMCS Plugtests Report V1.0.0 (Paris, 27–31 October 2025)](https://portal.etsi.org/Portals/0/TBpages/CTI/Docs/5th_ETSI_FRMCS_Plugtests_Report_V100.pdf) — ETSI, V1.0.0 (2025-11), Chapter 5, printed pp. 17–18, tables 1–8 (equipment roles); executive summary p. 5 (observers), retrieved 2026-10-03 · Original retrieved (Listed in table(s): 1 application server (MCPTT, MCData); 2 client (MCPTT, MCData); 4 5G system; 8 GSM-R. Evidence of test participation in a named equipment role only; the report states no products were certified.); [4th ETSI FRMCS Plugtests Report V1.1.0 (Sophia Antipolis, 1–5 July 2024)](https://portal.etsi.org/Portals/0/TBpages/CTI/Docs/4th_ETSI_FRMCS_Plugtests_Report_V110.pdf) — ETSI, V1.1.0 (2024-08), Executive summary, printed pp. 6–7 (observers and no-certification statement); chapter 5, printed pp. 19–20, tables 1–8 and footnotes (equipment roles and test conditions), published 2024-08, retrieved 2026-10-03 · Original retrieved (Listed in table(s): 1 application server (MCPTT, MCData); 2 client (MCPTT, MCData); 8 GSM-R. Evidence of test participation in a named equipment role and documented test condition only; this was an interoperability event and no products were certified.); [FP2-MORANE-2 – CORDIS project fact sheet (grant 101196125)](https://cordis.europa.eu/project/id/101196125) — European Commission, CORDIS, Project dates 1 Dec 2024 – 30 Sep 2027; participant list with role types, retrieved 2026-10-03 · Original retrieved (CORDIS role: participant. The project summary still refers to a TSI 2027 objective. That is the historic plan at proposal time; later UIC statements target CCS TSI 2028.); [5GRAIL – CORDIS project fact sheet (grant 951725, 1 Nov 2020 – 31 Dec 2023)](https://cordis.europa.eu/project/id/951725) — European Commission, CORDIS, Participant list with role types, retrieved 2026-10-03 · Original retrieved (CORDIS role: participant)

### Frequentis
- Areas: Control centres & applications, Communication services & MCX
- Documented contribution: Control centre communication, service and application layer, and transition to legacy systems
- Evidence assessment: Vendor profile; MCX server and dispatcher in the test environment
- Sources: [Your route to FRMCS](https://www.frequentis.com/en/public-transport/operations-communications/frmcs) — Frequentis, retrieved 2026-10-03 · Original retrieved (Manufacturer's own statement; not independent verification of delivery capability, approval or deployment. The site's editor is employed by Frequentis (see About).); [5th ETSI FRMCS Plugtests Report V1.0.0 (Paris, 27–31 October 2025)](https://portal.etsi.org/Portals/0/TBpages/CTI/Docs/5th_ETSI_FRMCS_Plugtests_Report_V100.pdf) — ETSI, V1.0.0 (2025-11), Chapter 5, printed pp. 17–18, tables 1–8 (equipment roles); executive summary p. 5 (observers), retrieved 2026-10-03 · Original retrieved (Listed in table(s): 1 application server (MCPTT, MCData); 3 dispatcher. Evidence of test participation in a named equipment role only; the report states no products were certified.); [4th ETSI FRMCS Plugtests Report V1.1.0 (Sophia Antipolis, 1–5 July 2024)](https://portal.etsi.org/Portals/0/TBpages/CTI/Docs/4th_ETSI_FRMCS_Plugtests_Report_V110.pdf) — ETSI, V1.1.0 (2024-08), Executive summary, printed pp. 6–7 (observers and no-certification statement); chapter 5, printed pp. 19–20, tables 1–8 and footnotes (equipment roles and test conditions), published 2024-08, retrieved 2026-10-03 · Original retrieved (Listed in table(s): 3 dispatcher (MCPTT). Evidence of test participation in a named equipment role and documented test condition only; this was an interoperability event and no products were certified.); [FP2-MORANE-2 – CORDIS project fact sheet (grant 101196125)](https://cordis.europa.eu/project/id/101196125) — European Commission, CORDIS, Project dates 1 Dec 2024 – 30 Sep 2027; participant list with role types, retrieved 2026-10-03 · Original retrieved (CORDIS role: participant. The project summary still refers to a TSI 2027 objective. That is the historic plan at proposal time; later UIC statements target CCS TSI 2028.)
- Disclosure: the editor is employed by Frequentis.

### Eviden
- Areas: Communication services & MCX, Control centres & applications, Onboard equipment & gateways
- Documented contribution: MCX servers and clients plus a portfolio with dispatcher, cab radio, gateway, interworking and recording functions
- Evidence assessment: Test participation and manufacturer announcements
- Sources: [Delivering your FRMCS transition](https://eviden.com/solutions/mission-critical-systems/critical-communications/transportation/delivering-your-frmcs-transition/) — Eviden, retrieved 2026-10-03 · Original retrieved (Manufacturer's own statement; not independent verification of delivery capability, approval or deployment.); [5th ETSI FRMCS Plugtests Report V1.0.0 (Paris, 27–31 October 2025)](https://portal.etsi.org/Portals/0/TBpages/CTI/Docs/5th_ETSI_FRMCS_Plugtests_Report_V100.pdf) — ETSI, V1.0.0 (2025-11), Chapter 5, printed pp. 17–18, tables 1–8 (equipment roles); executive summary p. 5 (observers), retrieved 2026-10-03 · Original retrieved (Listed in table(s): 1 application server (MCPTT, MCData); 2 client (MCPTT, MCData). Evidence of test participation in a named equipment role only; the report states no products were certified.); [4th ETSI FRMCS Plugtests Report V1.1.0 (Sophia Antipolis, 1–5 July 2024)](https://portal.etsi.org/Portals/0/TBpages/CTI/Docs/4th_ETSI_FRMCS_Plugtests_Report_V110.pdf) — ETSI, V1.1.0 (2024-08), Executive summary, printed pp. 6–7 (observers and no-certification statement); chapter 5, printed pp. 19–20, tables 1–8 and footnotes (equipment roles and test conditions), published 2024-08, retrieved 2026-10-03 · Original retrieved (Listed in table(s): 2 client (MCPTT, MCData); 3 dispatcher. Evidence of test participation in a named equipment role and documented test condition only; this was an interoperability event and no products were certified.); [FP2-MORANE-2 – CORDIS project fact sheet (grant 101196125)](https://cordis.europa.eu/project/id/101196125) — European Commission, CORDIS, Project dates 1 Dec 2024 – 30 Sep 2027; participant list with role types, retrieved 2026-10-03 · Original retrieved (CORDIS role: participant. The project summary still refers to a TSI 2027 objective. That is the historic plan at proposal time; later UIC statements target CCS TSI 2028.)

### RideOnTrack
- Areas: Control centres & applications
- Documented contribution: FRMCS/MCX dispatching
- Evidence assessment: Documented interoperability tests and MORANE-2 participation
- Sources: [5th ETSI FRMCS Plugtests Report V1.0.0 (Paris, 27–31 October 2025)](https://portal.etsi.org/Portals/0/TBpages/CTI/Docs/5th_ETSI_FRMCS_Plugtests_Report_V100.pdf) — ETSI, V1.0.0 (2025-11), Chapter 5, printed pp. 17–18, tables 1–8 (equipment roles); executive summary p. 5 (observers), retrieved 2026-10-03 · Original retrieved (Listed in table(s): 3 dispatcher. Evidence of test participation in a named equipment role only; the report states no products were certified.); [4th ETSI FRMCS Plugtests Report V1.1.0 (Sophia Antipolis, 1–5 July 2024)](https://portal.etsi.org/Portals/0/TBpages/CTI/Docs/4th_ETSI_FRMCS_Plugtests_Report_V110.pdf) — ETSI, V1.1.0 (2024-08), Executive summary, printed pp. 6–7 (observers and no-certification statement); chapter 5, printed pp. 19–20, tables 1–8 and footnotes (equipment roles and test conditions), published 2024-08, retrieved 2026-10-03 · Original retrieved (Listed in table(s): 3 dispatcher (MCPTT). Evidence of test participation in a named equipment role and documented test condition only; this was an interoperability event and no products were certified.); [FP2-MORANE-2 – CORDIS project fact sheet (grant 101196125)](https://cordis.europa.eu/project/id/101196125) — European Commission, CORDIS, Project dates 1 Dec 2024 – 30 Sep 2027; participant list with role types, retrieved 2026-10-03 · Original retrieved (CORDIS role: participant. The project summary still refers to a TSI 2027 objective. That is the historic plan at proposal time; later UIC statements target CCS TSI 2028.); [RideOnTrack completes first FP2 MORANE-2 test case](https://www.rideontrack.com/news/rideontrack-completes-first-fp2-morane-2-test-case/) — RideOnTrack, TS Controller test against a Kontron server in the Ericsson laboratory, retrieved 2026-10-03 · Original retrieved (vendor-reported TS Controller test against a Kontron server in the Ericsson laboratory; not certification. Manufacturer's own statement; not independent verification of delivery capability, approval or deployment.)

### Telematix
- Areas: Control centres & applications
- Documented contribution: Dispatcher with MCPTT and MCData support
- Evidence assessment: Documented test participation 2024
- Sources: [4th ETSI FRMCS Plugtests Report V1.1.0 (Sophia Antipolis, 1–5 July 2024)](https://portal.etsi.org/Portals/0/TBpages/CTI/Docs/4th_ETSI_FRMCS_Plugtests_Report_V110.pdf) — ETSI, V1.1.0 (2024-08), Executive summary, printed pp. 6–7 (observers and no-certification statement); chapter 5, printed pp. 19–20, tables 1–8 and footnotes (equipment roles and test conditions), published 2024-08, retrieved 2026-10-03 · Original retrieved (Listed in table(s): 3 dispatcher (MCPTT, MCData). Evidence of test participation in a named equipment role and documented test condition only; this was an interoperability event and no products were certified.)

### Funkwerk
- Areas: Onboard equipment & gateways
- Documented contribution: Cab radios, terminals and FRMCS/MCX clients
- Evidence assessment: Test participation and MORANE-2 participation
- Sources: [5th ETSI FRMCS Plugtests Report V1.0.0 (Paris, 27–31 October 2025)](https://portal.etsi.org/Portals/0/TBpages/CTI/Docs/5th_ETSI_FRMCS_Plugtests_Report_V100.pdf) — ETSI, V1.0.0 (2025-11), Chapter 5, printed pp. 17–18, tables 1–8 (equipment roles); executive summary p. 5 (observers), retrieved 2026-10-03 · Original retrieved (Listed in table(s): 2 client (MCPTT, MCData); 6 user equipment (5G device, cab radio). Evidence of test participation in a named equipment role only; the report states no products were certified.); [4th ETSI FRMCS Plugtests Report V1.1.0 (Sophia Antipolis, 1–5 July 2024)](https://portal.etsi.org/Portals/0/TBpages/CTI/Docs/4th_ETSI_FRMCS_Plugtests_Report_V110.pdf) — ETSI, V1.1.0 (2024-08), Executive summary, printed pp. 6–7 (observers and no-certification statement); chapter 5, printed pp. 19–20, tables 1–8 and footnotes (equipment roles and test conditions), published 2024-08, retrieved 2026-10-03 · Original retrieved (Listed in table(s): 2 client (MCPTT, MCData, GSM-R); 6 user equipment (cab radio). Evidence of test participation in a named equipment role and documented test condition only; this was an interoperability event and no products were certified.); [FP2-MORANE-2 – CORDIS project fact sheet (grant 101196125)](https://cordis.europa.eu/project/id/101196125) — European Commission, CORDIS, Project dates 1 Dec 2024 – 30 Sep 2027; participant list with role types, retrieved 2026-10-03 · Original retrieved (CORDIS role: participant. The project summary still refers to a TSI 2027 objective. That is the historic plan at proposal time; later UIC statements target CCS TSI 2028.)

### Siemens Mobility
- Areas: Onboard equipment & gateways
- Documented contribution: Cab radio in the FRMCS test environment
- Evidence assessment: Test participation and involvement in MORANE-2 and previously 5GRAIL
- Sources: [5th ETSI FRMCS Plugtests Report V1.0.0 (Paris, 27–31 October 2025)](https://portal.etsi.org/Portals/0/TBpages/CTI/Docs/5th_ETSI_FRMCS_Plugtests_Report_V100.pdf) — ETSI, V1.0.0 (2025-11), Chapter 5, printed pp. 17–18, tables 1–8 (equipment roles); executive summary p. 5 (observers), retrieved 2026-10-03 · Original retrieved (Listed in table(s): 6 user equipment (cab radio). Evidence of test participation in a named equipment role only; the report states no products were certified.); [4th ETSI FRMCS Plugtests Report V1.1.0 (Sophia Antipolis, 1–5 July 2024)](https://portal.etsi.org/Portals/0/TBpages/CTI/Docs/4th_ETSI_FRMCS_Plugtests_Report_V110.pdf) — ETSI, V1.1.0 (2024-08), Executive summary, printed pp. 6–7 (observers and no-certification statement); chapter 5, printed pp. 19–20, tables 1–8 and footnotes (equipment roles and test conditions), published 2024-08, retrieved 2026-10-03 · Original retrieved (Listed in table(s): 6 user equipment (cab radio). Evidence of test participation in a named equipment role and documented test condition only; this was an interoperability event and no products were certified.); [FP2-MORANE-2 – CORDIS project fact sheet (grant 101196125)](https://cordis.europa.eu/project/id/101196125) — European Commission, CORDIS, Project dates 1 Dec 2024 – 30 Sep 2027; participant list with role types, retrieved 2026-10-03 · Original retrieved (CORDIS role: participant. The project summary still refers to a TSI 2027 objective. That is the historic plan at proposal time; later UIC statements target CCS TSI 2028.); [5GRAIL – CORDIS project fact sheet (grant 951725, 1 Nov 2020 – 31 Dec 2023)](https://cordis.europa.eu/project/id/951725) — European Commission, CORDIS, Participant list with role types, retrieved 2026-10-03 · Original retrieved (CORDIS role: participant (Siemens Mobility Ltd))

### Alstom
- Areas: Onboard equipment & gateways
- Documented contribution: Onboard and trackside gateways in the FRMCS test environment
- Evidence assessment: Vendor profile, test participation and MORANE-2 participation
- Sources: [Technology leaders are testing the innovative FRMCS railway system](https://www.alstom.com/press-releases-news/2023/9/technology-leaders-are-testing-innovative-frmcs-railway-system) — Alstom, published 2023-09-20, retrieved 2026-10-03 · Original retrieved (Manufacturer's own statement; not independent verification of delivery capability, approval or deployment.); [5th ETSI FRMCS Plugtests Report V1.0.0 (Paris, 27–31 October 2025)](https://portal.etsi.org/Portals/0/TBpages/CTI/Docs/5th_ETSI_FRMCS_Plugtests_Report_V100.pdf) — ETSI, V1.0.0 (2025-11), Chapter 5, printed pp. 17–18, tables 1–8 (equipment roles); executive summary p. 5 (observers), retrieved 2026-10-03 · Original retrieved (Listed in table(s): 6 user equipment (on-board and track-side gateway). Evidence of test participation in a named equipment role only; the report states no products were certified.); [4th ETSI FRMCS Plugtests Report V1.1.0 (Sophia Antipolis, 1–5 July 2024)](https://portal.etsi.org/Portals/0/TBpages/CTI/Docs/4th_ETSI_FRMCS_Plugtests_Report_V110.pdf) — ETSI, V1.1.0 (2024-08), Executive summary, printed pp. 6–7 (observers and no-certification statement); chapter 5, printed pp. 19–20, tables 1–8 and footnotes (equipment roles and test conditions), published 2024-08, retrieved 2026-10-03 · Original retrieved (Listed in table(s): 6 user equipment (on-board and track-side gateway). Evidence of test participation in a named equipment role and documented test condition only; this was an interoperability event and no products were certified.); [FP2-MORANE-2 – CORDIS project fact sheet (grant 101196125)](https://cordis.europa.eu/project/id/101196125) — European Commission, CORDIS, Project dates 1 Dec 2024 – 30 Sep 2027; participant list with role types, retrieved 2026-10-03 · Original retrieved (CORDIS role: participant. The project summary still refers to a TSI 2027 objective. That is the historic plan at proposal time; later UIC statements target CCS TSI 2028.); [5GRAIL – CORDIS project fact sheet (grant 951725, 1 Nov 2020 – 31 Dec 2023)](https://cordis.europa.eu/project/id/951725) — European Commission, CORDIS, Participant list with role types, retrieved 2026-10-03 · Original retrieved (CORDIS role: participant)

### CAF
- Areas: Onboard equipment & gateways
- Documented contribution: Contribution to FRMCS development
- Evidence assessment: Participation in MORANE-2 and 5GRAIL; specific scope of supply remains open
- Sources: [FP2-MORANE-2 – CORDIS project fact sheet (grant 101196125)](https://cordis.europa.eu/project/id/101196125) — European Commission, CORDIS, Project dates 1 Dec 2024 – 30 Sep 2027; participant list with role types, retrieved 2026-10-03 · Original retrieved (CORDIS role: participant. The project summary still refers to a TSI 2027 objective. That is the historic plan at proposal time; later UIC statements target CCS TSI 2028.); [5GRAIL – CORDIS project fact sheet (grant 951725, 1 Nov 2020 – 31 Dec 2023)](https://cordis.europa.eu/project/id/951725) — European Commission, CORDIS, Participant list with role types, retrieved 2026-10-03 · Original retrieved (CORDIS role: participant)

### Hitachi Rail GTS
- Areas: Onboard equipment & gateways
- Documented contribution: Contribution to the MORANE-2 consortium
- Evidence assessment: CORDIS participant in MORANE-2 and 5GRAIL; no specific product or work package identified
- Sources: [FP2-MORANE-2 – CORDIS project fact sheet (grant 101196125)](https://cordis.europa.eu/project/id/101196125) — European Commission, CORDIS, Project dates 1 Dec 2024 – 30 Sep 2027; participant list with role types, retrieved 2026-10-03 · Original retrieved (CORDIS role: participant. The project summary still refers to a TSI 2027 objective. That is the historic plan at proposal time; later UIC statements target CCS TSI 2028.); [5GRAIL – CORDIS project fact sheet (grant 951725, 1 Nov 2020 – 31 Dec 2023)](https://cordis.europa.eu/project/id/951725) — European Commission, CORDIS, Participant list with role types, retrieved 2026-10-03 · Original retrieved (CORDIS role: participant)

### Teltronic
- Areas: Communication services & MCX, Control centres & applications, Onboard equipment & gateways
- Documented contribution: MCX servers, clients, dispatcher, cab radio and 5G system in the test environment
- Evidence assessment: Test participation and MORANE-2 participation
- Sources: [5th ETSI FRMCS Plugtests Report V1.0.0 (Paris, 27–31 October 2025)](https://portal.etsi.org/Portals/0/TBpages/CTI/Docs/5th_ETSI_FRMCS_Plugtests_Report_V100.pdf) — ETSI, V1.0.0 (2025-11), Chapter 5, printed pp. 17–18, tables 1–8 (equipment roles); executive summary p. 5 (observers), retrieved 2026-10-03 · Original retrieved (Listed in table(s): 1 application server (MCPTT, MCData); 2 client (MCPTT, MCData); 3 dispatcher; 4 5G system; 6 user equipment (cab radio). Evidence of test participation in a named equipment role only; the report states no products were certified.); [4th ETSI FRMCS Plugtests Report V1.1.0 (Sophia Antipolis, 1–5 July 2024)](https://portal.etsi.org/Portals/0/TBpages/CTI/Docs/4th_ETSI_FRMCS_Plugtests_Report_V110.pdf) — ETSI, V1.1.0 (2024-08), Executive summary, printed pp. 6–7 (observers and no-certification statement); chapter 5, printed pp. 19–20, tables 1–8 and footnotes (equipment roles and test conditions), published 2024-08, retrieved 2026-10-03 · Original retrieved (Listed in table(s): 1 application server (MCPTT, MCData); 3 dispatcher; 4 5G system; 6 user equipment (cab radio). Evidence of test participation in a named equipment role and documented test condition only; this was an interoperability event and no products were certified.); [FP2-MORANE-2 – CORDIS project fact sheet (grant 101196125)](https://cordis.europa.eu/project/id/101196125) — European Commission, CORDIS, Project dates 1 Dec 2024 – 30 Sep 2027; participant list with role types, retrieved 2026-10-03 · Original retrieved (CORDIS role: participant. The project summary still refers to a TSI 2027 objective. That is the historic plan at proposal time; later UIC statements target CCS TSI 2028.)

### VIAVI Solutions
- Areas: Test & monitoring
- Documented contribution: Measurement, active testing, monitoring and assessment of FRMCS prototypes
- Evidence assessment: Announced MORANE-2 contribution with EVOIA Drive Test and EVOIA Assure
- Sources: [EVOIA Assure (selected as monitoring solution for FP-MORANE2 testing)](https://www.viavisolutions.com/en-us/products/evoia-assure) — VIAVI Solutions, retrieved 2026-10-03 · Original retrieved (Manufacturer's own statement; not independent verification of delivery capability, approval or deployment.); [4th ETSI FRMCS Plugtests Report V1.1.0 (Sophia Antipolis, 1–5 July 2024)](https://portal.etsi.org/Portals/0/TBpages/CTI/Docs/4th_ETSI_FRMCS_Plugtests_Report_V110.pdf) — ETSI, V1.1.0 (2024-08), Executive summary, printed pp. 6–7 (observers and no-certification statement); chapter 5, printed pp. 19–20, tables 1–8 and footnotes (equipment roles and test conditions), published 2024-08, retrieved 2026-10-03 · Original retrieved (Listed in table(s): 2 client (MCPTT, MCData). Evidence of test participation in a named equipment role and documented test condition only; this was an interoperability event and no products were certified.); [FP2-MORANE-2 – CORDIS project fact sheet (grant 101196125)](https://cordis.europa.eu/project/id/101196125) — European Commission, CORDIS, Project dates 1 Dec 2024 – 30 Sep 2027; participant list with role types, retrieved 2026-10-03 · Original retrieved (CORDIS role: participant. The project summary still refers to a TSI 2027 objective. That is the historic plan at proposal time; later UIC statements target CCS TSI 2028.)

### Softil
- Areas: Communication services & MCX
- Documented contribution: Client and dispatcher in the ETSI FRMCS Plugtests 2024 and 2025
- Evidence assessment: ETSI test reports (tables 2–3)
- Sources: [5th ETSI FRMCS Plugtests Report V1.0.0 (Paris, 27–31 October 2025)](https://portal.etsi.org/Portals/0/TBpages/CTI/Docs/5th_ETSI_FRMCS_Plugtests_Report_V100.pdf) — ETSI, V1.0.0 (2025-11), Chapter 5, printed pp. 17–18, tables 1–8 (equipment roles); executive summary p. 5 (observers), retrieved 2026-10-03 · Original retrieved (Listed in table(s): 2 client (MCPTT, MCData); 3 dispatcher. Evidence of test participation in a named equipment role only; the report states no products were certified.); [4th ETSI FRMCS Plugtests Report V1.1.0 (Sophia Antipolis, 1–5 July 2024)](https://portal.etsi.org/Portals/0/TBpages/CTI/Docs/4th_ETSI_FRMCS_Plugtests_Report_V110.pdf) — ETSI, V1.1.0 (2024-08), Executive summary, printed pp. 6–7 (observers and no-certification statement); chapter 5, printed pp. 19–20, tables 1–8 and footnotes (equipment roles and test conditions), published 2024-08, retrieved 2026-10-03 · Original retrieved (Listed in table(s): 2 client (MCPTT, MCData); 3 dispatcher. Evidence of test participation in a named equipment role and documented test condition only; this was an interoperability event and no products were certified.)

### Nemergent Solutions
- Areas: Communication services & MCX
- Documented contribution: MCX application server and client in the ETSI Plugtests 2024 and 2025
- Evidence assessment: ETSI test reports (tables 1–2)
- Sources: [5th ETSI FRMCS Plugtests Report V1.0.0 (Paris, 27–31 October 2025)](https://portal.etsi.org/Portals/0/TBpages/CTI/Docs/5th_ETSI_FRMCS_Plugtests_Report_V100.pdf) — ETSI, V1.0.0 (2025-11), Chapter 5, printed pp. 17–18, tables 1–8 (equipment roles); executive summary p. 5 (observers), retrieved 2026-10-03 · Original retrieved (Listed in table(s): 1 application server (MCPTT, MCData); 2 client (MCPTT, MCData). Evidence of test participation in a named equipment role only; the report states no products were certified.); [4th ETSI FRMCS Plugtests Report V1.1.0 (Sophia Antipolis, 1–5 July 2024)](https://portal.etsi.org/Portals/0/TBpages/CTI/Docs/4th_ETSI_FRMCS_Plugtests_Report_V110.pdf) — ETSI, V1.1.0 (2024-08), Executive summary, printed pp. 6–7 (observers and no-certification statement); chapter 5, printed pp. 19–20, tables 1–8 and footnotes (equipment roles and test conditions), published 2024-08, retrieved 2026-10-03 · Original retrieved (Listed in table(s): 1 application server (MCPTT, MCData); 2 client (MCPTT, MCData). Evidence of test participation in a named equipment role and documented test condition only; this was an interoperability event and no products were certified.)

### Alea
- Areas: Communication services & MCX
- Documented contribution: MCX application server (2024, 2025) and client (2025) in the ETSI Plugtests
- Evidence assessment: ETSI test reports
- Sources: [5th ETSI FRMCS Plugtests Report V1.0.0 (Paris, 27–31 October 2025)](https://portal.etsi.org/Portals/0/TBpages/CTI/Docs/5th_ETSI_FRMCS_Plugtests_Report_V100.pdf) — ETSI, V1.0.0 (2025-11), Chapter 5, printed pp. 17–18, tables 1–8 (equipment roles); executive summary p. 5 (observers), retrieved 2026-10-03 · Original retrieved (Listed in table(s): 1 application server (MCPTT, MCData); 2 client (MCPTT, MCData). Evidence of test participation in a named equipment role only; the report states no products were certified.); [4th ETSI FRMCS Plugtests Report V1.1.0 (Sophia Antipolis, 1–5 July 2024)](https://portal.etsi.org/Portals/0/TBpages/CTI/Docs/4th_ETSI_FRMCS_Plugtests_Report_V110.pdf) — ETSI, V1.1.0 (2024-08), Executive summary, printed pp. 6–7 (observers and no-certification statement); chapter 5, printed pp. 19–20, tables 1–8 and footnotes (equipment roles and test conditions), published 2024-08, retrieved 2026-10-03 · Original retrieved (Listed in table(s): 1 application server (MCPTT, MCData). Evidence of test participation in a named equipment role and documented test condition only; this was an interoperability event and no products were certified.)

### MCLabs
- Areas: Communication services & MCX
- Documented contribution: MCX application server (2024, 2025) and dispatcher (2024) in the ETSI Plugtests
- Evidence assessment: ETSI test reports
- Sources: [5th ETSI FRMCS Plugtests Report V1.0.0 (Paris, 27–31 October 2025)](https://portal.etsi.org/Portals/0/TBpages/CTI/Docs/5th_ETSI_FRMCS_Plugtests_Report_V100.pdf) — ETSI, V1.0.0 (2025-11), Chapter 5, printed pp. 17–18, tables 1–8 (equipment roles); executive summary p. 5 (observers), retrieved 2026-10-03 · Original retrieved (Listed in table(s): 1 application server (MCPTT, MCData). Evidence of test participation in a named equipment role only; the report states no products were certified.); [4th ETSI FRMCS Plugtests Report V1.1.0 (Sophia Antipolis, 1–5 July 2024)](https://portal.etsi.org/Portals/0/TBpages/CTI/Docs/4th_ETSI_FRMCS_Plugtests_Report_V110.pdf) — ETSI, V1.1.0 (2024-08), Executive summary, printed pp. 6–7 (observers and no-certification statement); chapter 5, printed pp. 19–20, tables 1–8 and footnotes (equipment roles and test conditions), published 2024-08, retrieved 2026-10-03 · Original retrieved (Listed in table(s): 1 application server (MCPTT, MCData); 3 dispatcher. Evidence of test participation in a named equipment role and documented test condition only; this was an interoperability event and no products were certified.)

### Consort Digital
- Areas: Communication services & MCX
- Documented contribution: MCX application server, client and cab radio in the ETSI Plugtests 2024 and 2025
- Evidence assessment: ETSI test reports
- Sources: [5th ETSI FRMCS Plugtests Report V1.0.0 (Paris, 27–31 October 2025)](https://portal.etsi.org/Portals/0/TBpages/CTI/Docs/5th_ETSI_FRMCS_Plugtests_Report_V100.pdf) — ETSI, V1.0.0 (2025-11), Chapter 5, printed pp. 17–18, tables 1–8 (equipment roles); executive summary p. 5 (observers), retrieved 2026-10-03 · Original retrieved (Listed in table(s): 1 application server (MCPTT, MCData); 2 client (MCPTT, MCData); 6 user equipment (cab radio). Evidence of test participation in a named equipment role only; the report states no products were certified.); [4th ETSI FRMCS Plugtests Report V1.1.0 (Sophia Antipolis, 1–5 July 2024)](https://portal.etsi.org/Portals/0/TBpages/CTI/Docs/4th_ETSI_FRMCS_Plugtests_Report_V110.pdf) — ETSI, V1.1.0 (2024-08), Executive summary, printed pp. 6–7 (observers and no-certification statement); chapter 5, printed pp. 19–20, tables 1–8 and footnotes (equipment roles and test conditions), published 2024-08, retrieved 2026-10-03 · Original retrieved (Listed in table(s): 1 application server (MCPTT, MCData); 2 client (MCPTT, MCData); 6 user equipment (cab radio). Evidence of test participation in a named equipment role and documented test condition only; this was an interoperability event and no products were certified.)

### Cybertel
- Areas: Communication services & MCX
- Documented contribution: MCX application server, client and 5G device in the ETSI Plugtests 2024 and 2025
- Evidence assessment: ETSI test reports
- Sources: [5th ETSI FRMCS Plugtests Report V1.0.0 (Paris, 27–31 October 2025)](https://portal.etsi.org/Portals/0/TBpages/CTI/Docs/5th_ETSI_FRMCS_Plugtests_Report_V100.pdf) — ETSI, V1.0.0 (2025-11), Chapter 5, printed pp. 17–18, tables 1–8 (equipment roles); executive summary p. 5 (observers), retrieved 2026-10-03 · Original retrieved (Listed in table(s): 1 application server (MCPTT, MCData); 2 client (MCPTT, MCData); 6 user equipment (5G device). Evidence of test participation in a named equipment role only; the report states no products were certified.); [4th ETSI FRMCS Plugtests Report V1.1.0 (Sophia Antipolis, 1–5 July 2024)](https://portal.etsi.org/Portals/0/TBpages/CTI/Docs/4th_ETSI_FRMCS_Plugtests_Report_V110.pdf) — ETSI, V1.1.0 (2024-08), Executive summary, printed pp. 6–7 (observers and no-certification statement); chapter 5, printed pp. 19–20, tables 1–8 and footnotes (equipment roles and test conditions), published 2024-08, retrieved 2026-10-03 · Original retrieved (Listed in table(s): 1 application server (MCPTT, MCData); 2 client (MCPTT, MCData); 6 user equipment (5G device). Evidence of test participation in a named equipment role and documented test condition only; this was an interoperability event and no products were certified.)

### Hytera
- Areas: Communication services & MCX
- Documented contribution: MCX application server, client, 5G device; in 2025 also dispatcher and cab radio (ETSI Plugtests)
- Evidence assessment: ETSI test reports
- Sources: [5th ETSI FRMCS Plugtests Report V1.0.0 (Paris, 27–31 October 2025)](https://portal.etsi.org/Portals/0/TBpages/CTI/Docs/5th_ETSI_FRMCS_Plugtests_Report_V100.pdf) — ETSI, V1.0.0 (2025-11), Chapter 5, printed pp. 17–18, tables 1–8 (equipment roles); executive summary p. 5 (observers), retrieved 2026-10-03 · Original retrieved (Listed in table(s): 1 application server (MCPTT, MCData); 2 client (MCPTT, MCData); 3 dispatcher; 6 user equipment (5G device, cab radio). Evidence of test participation in a named equipment role only; the report states no products were certified.); [4th ETSI FRMCS Plugtests Report V1.1.0 (Sophia Antipolis, 1–5 July 2024)](https://portal.etsi.org/Portals/0/TBpages/CTI/Docs/4th_ETSI_FRMCS_Plugtests_Report_V110.pdf) — ETSI, V1.1.0 (2024-08), Executive summary, printed pp. 6–7 (observers and no-certification statement); chapter 5, printed pp. 19–20, tables 1–8 and footnotes (equipment roles and test conditions), published 2024-08, retrieved 2026-10-03 · Original retrieved (Listed in table(s): 1 application server (MCPTT, MCData); 2 client (MCPTT, MCData); 6 user equipment (5G device). Evidence of test participation in a named equipment role and documented test condition only; this was an interoperability event and no products were certified.)

### TASSTA
- Areas: Communication services & MCX
- Documented contribution: MCX application server (2024, 2025), client and dispatcher (2024) in the ETSI Plugtests
- Evidence assessment: ETSI test reports
- Sources: [5th ETSI FRMCS Plugtests Report V1.0.0 (Paris, 27–31 October 2025)](https://portal.etsi.org/Portals/0/TBpages/CTI/Docs/5th_ETSI_FRMCS_Plugtests_Report_V100.pdf) — ETSI, V1.0.0 (2025-11), Chapter 5, printed pp. 17–18, tables 1–8 (equipment roles); executive summary p. 5 (observers), retrieved 2026-10-03 · Original retrieved (Listed in table(s): 1 application server (MCPTT, MCData). Evidence of test participation in a named equipment role only; the report states no products were certified.); [4th ETSI FRMCS Plugtests Report V1.1.0 (Sophia Antipolis, 1–5 July 2024)](https://portal.etsi.org/Portals/0/TBpages/CTI/Docs/4th_ETSI_FRMCS_Plugtests_Report_V110.pdf) — ETSI, V1.1.0 (2024-08), Executive summary, printed pp. 6–7 (observers and no-certification statement); chapter 5, printed pp. 19–20, tables 1–8 and footnotes (equipment roles and test conditions), published 2024-08, retrieved 2026-10-03 · Original retrieved (Listed in table(s): 1 application server (MCPTT, MCData); 2 client (MCPTT, MCData); 3 dispatcher. Evidence of test participation in a named equipment role and documented test condition only; this was an interoperability event and no products were certified.)

### POCSTARS
- Areas: Communication services & MCX
- Documented contribution: MCX application server and client in the ETSI Plugtests 2025
- Evidence assessment: ETSI test report 2025
- Sources: [5th ETSI FRMCS Plugtests Report V1.0.0 (Paris, 27–31 October 2025)](https://portal.etsi.org/Portals/0/TBpages/CTI/Docs/5th_ETSI_FRMCS_Plugtests_Report_V100.pdf) — ETSI, V1.0.0 (2025-11), Chapter 5, printed pp. 17–18, tables 1–8 (equipment roles); executive summary p. 5 (observers), retrieved 2026-10-03 · Original retrieved (Listed in table(s): 1 application server (MCPTT, MCData); 2 client (MCPTT, MCData). Evidence of test participation in a named equipment role only; the report states no products were certified.)

### Jiaxun
- Areas: Communication services & MCX
- Documented contribution: MCX application server, client and dispatcher in the ETSI Plugtests 2025
- Evidence assessment: ETSI test report 2025
- Sources: [5th ETSI FRMCS Plugtests Report V1.0.0 (Paris, 27–31 October 2025)](https://portal.etsi.org/Portals/0/TBpages/CTI/Docs/5th_ETSI_FRMCS_Plugtests_Report_V100.pdf) — ETSI, V1.0.0 (2025-11), Chapter 5, printed pp. 17–18, tables 1–8 (equipment roles); executive summary p. 5 (observers), retrieved 2026-10-03 · Original retrieved (Listed in table(s): 1 application server (MCPTT, MCData); 2 client (MCPTT, MCData); 3 dispatcher. Evidence of test participation in a named equipment role only; the report states no products were certified.)

### C-DOT
- Areas: Communication services & MCX
- Documented contribution: MCX application server and client in the ETSI Plugtests 2024
- Evidence assessment: ETSI test report 2024
- Sources: [4th ETSI FRMCS Plugtests Report V1.1.0 (Sophia Antipolis, 1–5 July 2024)](https://portal.etsi.org/Portals/0/TBpages/CTI/Docs/4th_ETSI_FRMCS_Plugtests_Report_V110.pdf) — ETSI, V1.1.0 (2024-08), Executive summary, printed pp. 6–7 (observers and no-certification statement); chapter 5, printed pp. 19–20, tables 1–8 and footnotes (equipment roles and test conditions), published 2024-08, retrieved 2026-10-03 · Original retrieved (Listed in table(s): 1 application server (MCPTT, MCData); 2 client (MCPTT, MCData). Evidence of test participation in a named equipment role and documented test condition only; this was an interoperability event and no products were certified.)

### Hoimyung
- Areas: Control centres & applications
- Documented contribution: Dispatcher in the ETSI Plugtests 2024; the report footnote says it was not tested with an application server
- Evidence assessment: ETSI test report 2024 (table 3 and footnote)
- Sources: [4th ETSI FRMCS Plugtests Report V1.1.0 (Sophia Antipolis, 1–5 July 2024)](https://portal.etsi.org/Portals/0/TBpages/CTI/Docs/4th_ETSI_FRMCS_Plugtests_Report_V110.pdf) — ETSI, V1.1.0 (2024-08), Executive summary, printed pp. 6–7 (observers and no-certification statement); chapter 5, printed pp. 19–20, tables 1–8 and footnotes (equipment roles and test conditions), published 2024-08, retrieved 2026-10-03 · Original retrieved (Listed in table(s): 3 dispatcher; report footnote: not tested with an application server. Evidence of test participation in a named equipment role and documented test condition only; this was an interoperability event and no products were certified.)

### Leonardo
- Areas: Onboard equipment & gateways
- Documented contribution: Cab radio in the ETSI Plugtests 2025
- Evidence assessment: ETSI test report 2025 (table 6)
- Sources: [5th ETSI FRMCS Plugtests Report V1.0.0 (Paris, 27–31 October 2025)](https://portal.etsi.org/Portals/0/TBpages/CTI/Docs/5th_ETSI_FRMCS_Plugtests_Report_V100.pdf) — ETSI, V1.0.0 (2025-11), Chapter 5, printed pp. 17–18, tables 1–8 (equipment roles); executive summary p. 5 (observers), retrieved 2026-10-03 · Original retrieved (Listed in table(s): 6 user equipment (cab radio). Evidence of test participation in a named equipment role only; the report states no products were certified.)

### Qualcomm
- Areas: Onboard equipment & gateways
- Documented contribution: On-board gateway in the ETSI Plugtests 2025
- Evidence assessment: ETSI test report 2025 (table 6)
- Sources: [5th ETSI FRMCS Plugtests Report V1.0.0 (Paris, 27–31 October 2025)](https://portal.etsi.org/Portals/0/TBpages/CTI/Docs/5th_ETSI_FRMCS_Plugtests_Report_V100.pdf) — ETSI, V1.0.0 (2025-11), Chapter 5, printed pp. 17–18, tables 1–8 (equipment roles); executive summary p. 5 (observers), retrieved 2026-10-03 · Original retrieved (Listed in table(s): 6 user equipment (on-board gateway). Evidence of test participation in a named equipment role only; the report states no products were certified.)

### Shenzhen SED
- Areas: Onboard equipment & gateways
- Documented contribution: MCX server and client, 5G device, on-board and track-side gateway in the ETSI Plugtests 2025
- Evidence assessment: ETSI test report 2025
- Sources: [5th ETSI FRMCS Plugtests Report V1.0.0 (Paris, 27–31 October 2025)](https://portal.etsi.org/Portals/0/TBpages/CTI/Docs/5th_ETSI_FRMCS_Plugtests_Report_V100.pdf) — ETSI, V1.0.0 (2025-11), Chapter 5, printed pp. 17–18, tables 1–8 (equipment roles); executive summary p. 5 (observers), retrieved 2026-10-03 · Original retrieved (Listed in table(s): 1 application server (MCPTT, MCData); 2 client (MCPTT, MCData); 6 user equipment (5G device, on-board and track-side gateway). Evidence of test participation in a named equipment role only; the report states no products were certified.)

### Tianjin 712 Mobile
- Areas: Onboard equipment & gateways
- Documented contribution: Cab radio and on-board gateway in the ETSI Plugtests 2025
- Evidence assessment: ETSI test report 2025 (table 6)
- Sources: [5th ETSI FRMCS Plugtests Report V1.0.0 (Paris, 27–31 October 2025)](https://portal.etsi.org/Portals/0/TBpages/CTI/Docs/5th_ETSI_FRMCS_Plugtests_Report_V100.pdf) — ETSI, V1.0.0 (2025-11), Chapter 5, printed pp. 17–18, tables 1–8 (equipment roles); executive summary p. 5 (observers), retrieved 2026-10-03 · Original retrieved (Listed in table(s): 6 user equipment (cab radio, on-board gateway). Evidence of test participation in a named equipment role only; the report states no products were certified.)

### Crosscall
- Areas: Onboard equipment & gateways
- Documented contribution: 5G device in the ETSI Plugtests 2024 and 2025
- Evidence assessment: ETSI test reports (table 6)
- Sources: [5th ETSI FRMCS Plugtests Report V1.0.0 (Paris, 27–31 October 2025)](https://portal.etsi.org/Portals/0/TBpages/CTI/Docs/5th_ETSI_FRMCS_Plugtests_Report_V100.pdf) — ETSI, V1.0.0 (2025-11), Chapter 5, printed pp. 17–18, tables 1–8 (equipment roles); executive summary p. 5 (observers), retrieved 2026-10-03 · Original retrieved (Listed in table(s): 6 user equipment (5G device). Evidence of test participation in a named equipment role only; the report states no products were certified.); [4th ETSI FRMCS Plugtests Report V1.1.0 (Sophia Antipolis, 1–5 July 2024)](https://portal.etsi.org/Portals/0/TBpages/CTI/Docs/4th_ETSI_FRMCS_Plugtests_Report_V110.pdf) — ETSI, V1.1.0 (2024-08), Executive summary, printed pp. 6–7 (observers and no-certification statement); chapter 5, printed pp. 19–20, tables 1–8 and footnotes (equipment roles and test conditions), published 2024-08, retrieved 2026-10-03 · Original retrieved (Listed in table(s): 6 user equipment (5G device). Evidence of test participation in a named equipment role and documented test condition only; this was an interoperability event and no products were certified.)

### Sanchar
- Areas: Onboard equipment & gateways, Communication services & MCX
- Documented contribution: MCPTT client in the ETSI Plugtests (2024 remote over-the-top only)
- Evidence assessment: ETSI test reports (table 2)
- Sources: [5th ETSI FRMCS Plugtests Report V1.0.0 (Paris, 27–31 October 2025)](https://portal.etsi.org/Portals/0/TBpages/CTI/Docs/5th_ETSI_FRMCS_Plugtests_Report_V100.pdf) — ETSI, V1.0.0 (2025-11), Chapter 5, printed pp. 17–18, tables 1–8 (equipment roles); executive summary p. 5 (observers), retrieved 2026-10-03 · Original retrieved (Listed in table(s): 2 client (MCPTT). Evidence of test participation in a named equipment role only; the report states no products were certified.); [4th ETSI FRMCS Plugtests Report V1.1.0 (Sophia Antipolis, 1–5 July 2024)](https://portal.etsi.org/Portals/0/TBpages/CTI/Docs/4th_ETSI_FRMCS_Plugtests_Report_V110.pdf) — ETSI, V1.1.0 (2024-08), Executive summary, printed pp. 6–7 (observers and no-certification statement); chapter 5, printed pp. 19–20, tables 1–8 and footnotes (equipment roles and test conditions), published 2024-08, retrieved 2026-10-03 · Original retrieved (Listed in table(s): 2 client (MCPTT, MCData; remote over-the-top only). Evidence of test participation in a named equipment role and documented test condition only; this was an interoperability event and no products were certified.)

### AllWayTon Technology
- Areas: Onboard equipment & gateways
- Documented contribution: Smartphones for FRMCS, public 5G mobile networks and GSM-R
- Evidence assessment: Eviden and AllWayTon claim availability for sale in their September 2026 manufacturer announcement; no independent railway-specific certification evidenced
- Sources: [Eviden and AllWayTon partner to bring the first triple-mode FRMCS/5G P/GSM-R smartphones to the railway industry](https://eviden.com/insights/press-releases/eviden-and-allwayton-partner-to-bring-the-first-triple-mode-frmcs-5g-p-gsm-r-smartphones-to-railway-industry/) — Eviden, published 2026-09-22, retrieved 2026-10-03 · Original retrieved (Manufacturer's own statement; not independent verification of delivery capability, approval or deployment.)

### Druid
- Areas: Network infrastructure & transport
- Documented contribution: Listed in the ETSI test environment in the 5G systems category
- Evidence assessment: ETSI test environment
- Sources: [5th ETSI FRMCS Plugtests Report V1.0.0 (Paris, 27–31 October 2025)](https://portal.etsi.org/Portals/0/TBpages/CTI/Docs/5th_ETSI_FRMCS_Plugtests_Report_V100.pdf) — ETSI, V1.0.0 (2025-11), Chapter 5, printed pp. 17–18, tables 1–8 (equipment roles); executive summary p. 5 (observers), retrieved 2026-10-03 · Original retrieved (Listed in table(s): 4 5G system. Evidence of test participation in a named equipment role only; the report states no products were certified.); [4th ETSI FRMCS Plugtests Report V1.1.0 (Sophia Antipolis, 1–5 July 2024)](https://portal.etsi.org/Portals/0/TBpages/CTI/Docs/4th_ETSI_FRMCS_Plugtests_Report_V110.pdf) — ETSI, V1.1.0 (2024-08), Executive summary, printed pp. 6–7 (observers and no-certification statement); chapter 5, printed pp. 19–20, tables 1–8 and footnotes (equipment roles and test conditions), published 2024-08, retrieved 2026-10-03 · Original retrieved (Listed in table(s): 4 5G system. Evidence of test participation in a named equipment role and documented test condition only; this was an interoperability event and no products were certified.)

### Huawei
- Areas: Network infrastructure & transport
- Documented contribution: Own solutions with an FRMCS reference
- Evidence assessment: Manufacturer publications; consider the specification context
- Sources: [FRMCS – Railway Digital Transformation](https://e.huawei.com/en/solutions/enterprise-wireless/industry-wireless/frmcs) — Huawei, retrieved 2026-10-03 · Original retrieved (Manufacturer's own statement; not independent verification of delivery capability, approval or deployment.); [5th ETSI FRMCS Plugtests Report V1.0.0 (Paris, 27–31 October 2025)](https://portal.etsi.org/Portals/0/TBpages/CTI/Docs/5th_ETSI_FRMCS_Plugtests_Report_V100.pdf) — ETSI, V1.0.0 (2025-11), Chapter 5, printed pp. 17–18, tables 1–8 (equipment roles); executive summary p. 5 (observers), retrieved 2026-10-03 · Original retrieved (Listed in table(s): 4 5G system. Evidence of test participation in a named equipment role only; the report states no products were certified.)

### ZTE
- Areas: Network infrastructure & transport
- Documented contribution: Own solutions with an FRMCS reference; the recorded publication relates to products for China Railway
- Evidence assessment: Manufacturer publications; consider the specification context
- Sources: [ZTE FRMCS: Empowering Railway Digitalization (ZTE Technologies 2024/5)](https://www.zte.com.cn/content/zte-site/www-zte-com-cn/global/about/magazine/zte-technologies/2024/5-en/special-topic--frmcs/1.html) — ZTE, published 2024-09-13, retrieved 2026-10-03 · Original retrieved (Manufacturer's own statement; not independent verification of delivery capability, approval or deployment.)

### HUBER+SUHNER
- Areas: Components & integration
- Documented contribution: Dual-band GSM-R/FRMCS antenna (900 and 1900 MHz)
- Evidence assessment: Manufacturer publication
- Sources: [Supporting the FRMCS transition](https://www.hubersuhner.com/en/newsroom/blog-and-literature/blog/supporting-frmcs-transition) — HUBER+SUHNER, SENCITY Rail ACTIVE Rooftop antenna, published 2025-10-13, retrieved 2026-10-03 · Original retrieved (Manufacturer's own statement; not independent verification of delivery capability, approval or deployment.)

### POLOMARCONI
- Areas: Components & integration
- Documented contribution: Radio equipment, antennas and components for the bands and profiles required by FRMCS
- Evidence assessment: Europe's Rail industry report, section 2.6, p. 4; not product certification
- Sources: [POLOMARCONI.IT – home page (antennas, filters and passive components for critical communication)](https://www.polomarconi.it/en/) — POLOMARCONI, retrieved 2026-10-03 · Original retrieved (Shows a railway/critical-communication RF portfolio; the page does not name FRMCS.); [FRMCS Deployment Strategies: insights from the Deployment Group](https://rail-research.europa.eu/wp-content/uploads/2025/11/FRMCS-Deployment-Strategies-insights-from-the-Deployment-Group.pdf) — Europe's Rail, Section 2.6, printed p. 4 (POLOMARCONI); author information, printed p. 6 (Comesvil FRMCS LAB), retrieved 2026-10-03 · Original retrieved (section 2.6: FRMCS radio equipment, antennas and components. Primary industry deployment-group publication; claims are limited to the passages identified and do not establish certification or deployment.)

### duagon
- Areas: Components & integration, Onboard equipment & gateways
- Documented contribution: Connectivity modules integrating 5G, GSM-R and FRMCS
- Evidence assessment: Manufacturer publication under ‘Connectivity’; no independent certification evidenced
- Sources: [CompactPCI — Connectivity](https://www.duagon.com/de/compactpci/) — duagon, Konnektivität, retrieved 2026-10-03 · Original retrieved (Manufacturer's own statement; not independent verification of delivery capability, approval or deployment.)

### Comesvil
- Areas: Components & integration, Test & monitoring
- Documented contribution: FRMCS LAB project with the University of Naples Federico II for integration, prototyping and testing
- Evidence assessment: Italian Ministry agreement dated 11 February 2025, printed p. 6, and Europe's Rail author information; project objectives, not claimed achievements or certification
- Sources: [Accordo per l’innovazione — obiettivo e piano di comunicazione](https://www.mimit.gov.it/images/stories/IncentiviImprese_Normativa/30_04_25_obiettivo_comunicazione.pdf) — Ministero delle Imprese e del Made in Italy, Innovation agreement dated 11 February 2025, Printed p. 6, published 2025-02-11, retrieved 2026-10-03 · Original retrieved (printed p. 6: FRMCS LAB integration, prototyping and testing objectives. Independent Italian Ministry primary source; objectives are not represented as achieved results.); [FRMCS Deployment Strategies: insights from the Deployment Group](https://rail-research.europa.eu/wp-content/uploads/2025/11/FRMCS-Deployment-Strategies-insights-from-the-Deployment-Group.pdf) — Europe's Rail, Section 2.6, printed p. 4 (POLOMARCONI); author information, printed p. 6 (Comesvil FRMCS LAB), retrieved 2026-10-03 · Original retrieved (author information on printed p. 6: FRMCS LAB role. Primary industry deployment-group publication; claims are limited to the passages identified and do not establish certification or deployment.)

### WINGCON
- Areas: Components & integration, Communication services & MCX
- Documented contribution: Session border controller designed with FRMCS in mind
- Evidence assessment: Manufacturer publication
- Sources: [Session Border Controller](https://wingcon.com/de/portfolio/solutions/session-border-controller) — WINGCON, FRMCS application statement, retrieved 2026-10-03 · Original retrieved (Manufacturer's own statement; not independent verification of delivery capability, approval or deployment.)

### Telit Cinterion
- Areas: Components & integration
- Documented contribution: Announced FE990D60-FR module variant supporting FRMCS bands n100/n101; engineering samples were expected in Q3 2026, but availability is not confirmed
- Evidence assessment: Manufacturer announcement of 18 March 2026; earlier 5GRAIL participant
- Sources: [Telit Cinterion expands 5G leadership with new 3GPP Release 18 modules and FRMCS-ready variant](https://www.telit.com/press/telit-cinterion-expands-5g-leadership-with-new-3gpp-release-18-modules-and-frmcs-ready-variant/) — Telit Cinterion, FE990D60-FR announcement and expected sample timing, published 2026-03-18, retrieved 2026-10-03 · Original retrieved (Manufacturer's own statement; not independent verification of delivery capability, approval or deployment.); [5GRAIL – CORDIS project fact sheet (grant 951725, 1 Nov 2020 – 31 Dec 2023)](https://cordis.europa.eu/project/id/951725) — European Commission, CORDIS, Participant list with role types, retrieved 2026-10-03 · Original retrieved (CORDIS role: participant)

### Westermo
- Areas: Components & integration
- Documented contribution: States an active role in FRMCS standardisation through ETSI and UNIFE and describes onboard networking solutions
- Evidence assessment: Manufacturer publication; no independent certification evidenced
- Sources: [FRMCS: 5G Railway Communication System](https://www.westermo.com/us/industries/rail/FRMCS-5g-rail-communication) — Westermo, Standardisation and onboard networking, retrieved 2026-10-03 · Original retrieved (Manufacturer's own statement; not independent verification of delivery capability, approval or deployment.)

### Teleste
- Areas: Components & integration, Test & monitoring
- Documented contribution: Verification and validation of video and CCTV services in the historic 5GRAIL project
- Evidence assessment: CORDIS participant list and original Teleste publication; not certification
- Sources: [Towards smart and safe infrastructures](https://www.teleste.com/company/this-is-teleste/innovations-and-rd/towards-smart-and-safe-infrastructures/) — Teleste, 5GRAIL video and CCTV verification and validation, retrieved 2026-10-03 · Original retrieved (Manufacturer's own statement; not independent verification of delivery capability, approval or deployment.); [5GRAIL – CORDIS project fact sheet (grant 951725, 1 Nov 2020 – 31 Dec 2023)](https://cordis.europa.eu/project/id/951725) — European Commission, CORDIS, Participant list with role types, retrieved 2026-10-03 · Original retrieved (CORDIS role: participant)

### Valid8
- Areas: Test & monitoring
- Documented contribution: MCX conformance tester (2024, 2025); in 2025 also server, dispatcher and 5G system roles (ETSI Plugtests)
- Evidence assessment: ETSI test reports
- Sources: [5th ETSI FRMCS Plugtests Report V1.0.0 (Paris, 27–31 October 2025)](https://portal.etsi.org/Portals/0/TBpages/CTI/Docs/5th_ETSI_FRMCS_Plugtests_Report_V100.pdf) — ETSI, V1.0.0 (2025-11), Chapter 5, printed pp. 17–18, tables 1–8 (equipment roles); executive summary p. 5 (observers), retrieved 2026-10-03 · Original retrieved (Listed in table(s): 1 application server (MCPTT, MCData); 3 dispatcher; 4 5G system; 7 MCX conformance tester. Evidence of test participation in a named equipment role only; the report states no products were certified.); [4th ETSI FRMCS Plugtests Report V1.1.0 (Sophia Antipolis, 1–5 July 2024)](https://portal.etsi.org/Portals/0/TBpages/CTI/Docs/4th_ETSI_FRMCS_Plugtests_Report_V110.pdf) — ETSI, V1.1.0 (2024-08), Executive summary, printed pp. 6–7 (observers and no-certification statement); chapter 5, printed pp. 19–20, tables 1–8 and footnotes (equipment roles and test conditions), published 2024-08, retrieved 2026-10-03 · Original retrieved (Listed in table(s): 3 dispatcher; 7 MCX conformance tester. Evidence of test participation in a named equipment role and documented test condition only; this was an interoperability event and no products were certified.)

### Opale
- Areas: Test & monitoring
- Documented contribution: KPI tester in the ETSI Plugtests 2025
- Evidence assessment: ETSI test report 2025 (table 7)
- Sources: [5th ETSI FRMCS Plugtests Report V1.0.0 (Paris, 27–31 October 2025)](https://portal.etsi.org/Portals/0/TBpages/CTI/Docs/5th_ETSI_FRMCS_Plugtests_Report_V100.pdf) — ETSI, V1.0.0 (2025-11), Chapter 5, printed pp. 17–18, tables 1–8 (equipment roles); executive summary p. 5 (observers), retrieved 2026-10-03 · Original retrieved (Listed in table(s): 7 KPI tester. Evidence of test participation in a named equipment role only; the report states no products were certified.)

### Rohde & Schwarz
- Areas: Test & monitoring
- Documented contribution: Drive-test software stated to support 5G including FRMCS
- Evidence assessment: Manufacturer publication
- Sources: [R&S ROMES4 drive test software (supports 5G incl. FRMCS)](https://www.rohde-schwarz.com/us/products/test-and-measurement/network-data-collection/rs-romes4-drive-test-software_63493-8650.html) — Rohde & Schwarz, retrieved 2026-10-03 · Original retrieved (Manufacturer's own statement; not independent verification of delivery capability, approval or deployment.)

### MCS-TaaSting
- Areas: Test & monitoring
- Documented contribution: Appears in the 2024 test report as the name of an MCX conformance tester
- Evidence assessment: The legal entity was not further resolved in the research
- Sources: [4th ETSI FRMCS Plugtests Report V1.1.0 (Sophia Antipolis, 1–5 July 2024)](https://portal.etsi.org/Portals/0/TBpages/CTI/Docs/4th_ETSI_FRMCS_Plugtests_Report_V110.pdf) — ETSI, V1.1.0 (2024-08), Executive summary, printed pp. 6–7 (observers and no-certification statement); chapter 5, printed pp. 19–20, tables 1–8 and footnotes (equipment roles and test conditions), published 2024-08, retrieved 2026-10-03 · Original retrieved (Listed in table(s): 7 MCX conformance tester. Evidence of test participation in a named equipment role and documented test condition only; this was an interoperability event and no products were certified.)

## Basis sources
- [5th ETSI FRMCS Plugtests Report V1.0.0 (Paris, 27–31 October 2025)](https://portal.etsi.org/Portals/0/TBpages/CTI/Docs/5th_ETSI_FRMCS_Plugtests_Report_V100.pdf) — ETSI, V1.0.0 (2025-11), Chapter 5, printed pp. 17–18, tables 1–8 (equipment roles); executive summary p. 5 (observers), retrieved 2026-10-03 · Original retrieved (Evidence of test participation in a named equipment role only; the report states no products were certified.)
- [4th ETSI FRMCS Plugtests Report V1.1.0 (Sophia Antipolis, 1–5 July 2024)](https://portal.etsi.org/Portals/0/TBpages/CTI/Docs/4th_ETSI_FRMCS_Plugtests_Report_V110.pdf) — ETSI, V1.1.0 (2024-08), Executive summary, printed pp. 6–7 (observers and no-certification statement); chapter 5, printed pp. 19–20, tables 1–8 and footnotes (equipment roles and test conditions), published 2024-08, retrieved 2026-10-03 · Original retrieved (Evidence of test participation in a named equipment role and documented test condition only; this was an interoperability event and no products were certified.)
- [FP2-MORANE-2 – CORDIS project fact sheet (grant 101196125)](https://cordis.europa.eu/project/id/101196125) — European Commission, CORDIS, Project dates 1 Dec 2024 – 30 Sep 2027; participant list with role types, retrieved 2026-10-03 · Original retrieved (The project summary still refers to a TSI 2027 objective. That is the historic plan at proposal time; later UIC statements target CCS TSI 2028.)
- [FP2-MORANE-2 – Project structure](https://rail-research.europa.eu/pages/fp2-morane-2/structure) — Europe's Rail, Project structure, retrieved 2026-10-03 · Original retrieved
- [Joint UIC–UNIFE press release: FP2-MORANE-2 (28 January 2025)](https://uic.org/com/IMG/pdf/joint_press_release_morane-2.pdf) — UIC, UNIFE, published 2025-01-28, retrieved 2026-10-03 · Archived copy retrieved [archived copy 2025-02-22](https://web.archive.org/web/20250222063615/https://uic.org/com/IMG/pdf/joint_press_release_morane-2.pdf) (uic.org showed a maintenance page on 2026-10-03; the statement was confirmed in the Internet Archive snapshot of this exact URL.)
- [5GRAIL – CORDIS project fact sheet (grant 951725, 1 Nov 2020 – 31 Dec 2023)](https://cordis.europa.eu/project/id/951725) — European Commission, CORDIS, Participant list with role types, retrieved 2026-10-03 · Original retrieved

## Specialist group notes
- MCX software and communication platforms: Roles differ considerably: for some companies, test reports evidence specific server or client functions. Participating with one component does not yet describe a complete offering for railway operations.
- Further network vendors: For international offerings, the specification context is particularly important: a solution marketed as FRMCS or 5G-R is not, by that designation alone, demonstrably compliant with all European FRMCS requirements.
- Components and integration: These contributions are relevant for system integration. However, their respective development, delivery and approval status must be assessed at product level.
- Test, measurement and validation: Test systems help verify interfaces and performance. Their role differs from providing an operational communication system.